PreDrywall Inspection

Process - 

  • Submit Request on this site for tracking.  
  • eMail credentials (License, Certificate, Insurance) to builder. 
  • Confirm with builder 
    • Home is inspection ready.
    • Procure agreed inspection timeslot. (1.5 hrs)



Inspection checklist - 

  • Concrete
  • Wrap
  • Windows
  • Brackets
  • Top Plates
  • Bottom Plates
  • Beams
  • Joists
  • Truss
  • Studs
  • Blockings
  • OSB Boards
  • Wiring
  • Piping
  • Vents
  • Ducts
  • Baffles
  • Insulation 
    • Windows
    • Doors
    • OSB
    • Pipes
    • Outlet boxes
    • Wiring
    • Freon line